PROJECTS
line
 
CBRE spacer30 U.S. Department of Homeland Security
Fortune 100 Company   U.S. Department of Interior
General Services Administration   U.S. Department of Labor
M & T Bank   Mine Safety & Heath Administration
National Naval Medical Center   U.S. Department of Treasury
Naval Warfare Facility   University of MD Medical Systems
TK Services   WV Air National Guard
U.S. Army Corps of Engineers    
line
 
CBRE (EDS/HP), Washington, DC
SERVICE: Data Center Relocation    
Wycliffe relocated the EDS Data Center located in Washington, DC from the 12th floor to the 11th floor. HP had recently acquired EDS and in a cost cutting effort, consolidated several of their locations from other sites and at this facility. The project consisted of redesigning the Data Center on the 11th floor that included additional redundancy in air conditioning and a more stream lined electrical delivery system. All systems in the areas vacated had to be removed and the move had to be done in one weekend. Wycliffe built the new space and associated peripheral infrastructure in advance and moved all the systems over the one weekend allowing the customer to resume operations by Sunday afternoon to work out any hardware issues.
 
CBRE (EDS/HP), VA
SERVICE: Interior Alterations                           
Wycliffe had to partition an existing EDS space located in Virginia after HP had acquired EDS in a cost cutting effort to consolidate another location into this space. This project consisted of architectural design to maintain proper egress for both sides of the space in order to conform to the local jurisdiction’s requirements. We provided all electrical, voice, data and fiber installation as well as compliance with required renovations to egress, fire alarm and sprinkler systems.
 
Fortune 100 Company - Transportation Dispatch/Data Center Facility, MD
SERVICE: Mission Critical Facility Build Out
This fast track 12,000 sq ft project was completed in four months. This is a critical Dispatch Facility that entailed Redundant UPS, Generator, HVAC, and Raised Flooring.
 
Fortune 100 Company - Dispatch/Data Center Facility, WV
SERVICE: Mission Critical Facility Build Out
Wycliffe built this 10,500 sq ft facility in a four month period. This is a critical Dispatch Facility that entailed Redundant UPS, Generator, HVAC, and Raised Flooring.
back to top >>
Fortune 100 Company - Wellness (Fitness) Center, NY
SERVICE: Fitness Center Build Out
Wycliffe renovated space in an existing leased property to build out a Wellness Center. This project was a design build that included MEP & Architectural drawings. The project consisted of all electrical, mechanical and high end flooring components.  Included in this project were upgrades to the existing life safety systems to meet code.
 
Fortune 100 Company - Office Renovation, Washington, DC
SERVICE:  Interior Alterations
Wycliffe renovated this existing space in Washington, DC in a high profile location while allowing the customer to maintain day to day operations.
 
Fortune 100 Company - Dispatch/Data Center/Division Offices, TN
SERVICE: Mission Critical Facility Build Out
Wycliffe built this 20,000 sq ft facility within a five month period. This facility included a critical Dispatch Facility that entailed Redundant UPS, Generator, HVAC, and Raised Flooring.  A portion of this space was also built out for high end Division offices.

Fortune 100 Company - Dispatch/Data Center/Division Offices, OH
SERVICE: Mission Critical Facility Build Out 
Wycliffe built this 17,000 sq ft facility within a five month period. This facility included a critical Dispatch Facility that entailed Redundant UPS, Generator, HVAC, and Raised Flooring.  A portion of this space was also built out for high end Division offices.

back to top >>
Fortune 100 Company - Police Offices, MD
SERVICE: Police Office Build Out  
Wycliffe built out existing warehouse space to provide this client with a new Police Operations space. This project included all walls, ceiling, HVAC, electrical and plumbing and was completed in less than five weeks.
 
Fortune 100 Company - Fitness Locker/Restrooms, MD
SERVICE: Construction of Restrooms  
Wycliffe built out existing warehouse space to provide this client with a new locker/restroom facility for their existing fitness center. This project included all walls, ceiling, HVAC, electrical and plumbing and was completed in less than six weeks.
 
General Services Administration (Internal Revenue Service), Washington, DC  
SERVICE: Raised Flooring        
Wycliffe has provided demolition and replacement of raised flooring for the IRS at the 500 N. Capitol Street Washington, DC 4th and 7th floor Data Center locations. Wycliffe had to provide rigging to move servers, cabinets, racks and shore up the poor support for the existing UPS and AC equipment. The original raised flooring was unsafe due to neglect over a long period causing pedestals to collapse under large UPS and Battery systems. This project had to be done in one weekend with minimal disruption to the Data Center.
 
General Services Administration - Garmatz Building, MD
SERVICE: Fire Alarm Upgrade 
Wycliffe is currently upgrading the fire alarm systems for this building to meet updated codes and GSA requirements.  This project will be completed in approximately three months.
 
General Services Administration (Internal Revenue Service), Washington, DC
SERVICE: HVAC Maintenance            
Wycliffe provides Preventive Maintenance and Inspection Services on the HVAC located at 1750 Pennsylvania Avenue, Washington, DC.
back to top >>
General Services Administration (Internal Revenue Service), Washington, DC
SERVICE: Ballast Replacement                        
Wycliffe provided labor and materials to replace existing light fixtures with new energy efficient light fixtures with electronic ballasts on three of their leased floors. This allowed the government agency to realize cost savings and increased productivity from employees. All work had to be done on weekends when there was no disruption to the customer and scheduled in advance. This project was completed over a three month period.
 
General Services Administration (U.S. Secret Service), Washington, DC
SERVICE: Communications Cabling                   
Wycliffe provided demolition and running of new voice, data and fiber optic cabling at this secure location. Wycliffe also ran all conduit, junction boxes, etc to facilitate this project. This project had to be performed within a 30 day period and the cutover of all communications done over one weekend with minimal disruption to this agency.
 
General Services Administration (U.S. Department of Treasury), Washington, DC
SERVICE: Interior Alterations                       
Wycliffe provided interior alterations to build out the 11th floor portion of this project located at 1750 Pennsylvania Ave., NW Washington, DC. All construction, mechanical and electrical for this project was performed during overtime hours to minimize disruption to employees.
 
M & T Bank, MD
SERVICE: Elastomeric Building Coating
Wycliffe pressure washed the outside façade of the building and reclaimed all water for proper disposal as per EPA guidelines. After the façade was cleaned thoroughly, WEI applied an elastomeric coating to seal the pressure washed sections. All work had to be done during evening and weekend hours to prevent disruption to automobile and foot traffic.
back to top >>
National Naval Medical Center, Bethesda, MD
SERVICE:  Wire Mesh Partitions         
Project included the layout and installation of 20’ high wire mesh partitions with single swing and sliding gates. Wycliffe also installed approx 100 lineal feet of 42” high pipe railing for safety protection.
 
Naval Warfare Facility, MD
SERVICE: Heat: Foundation   
This project entailed grading and pouring a foundation for a future building.  The building had to be done as a separate project.
 
TK Services - Naval Security Station Nebraska Avenue Complex (DHS), Washington, DC
SERVICE: Heat Exchanger, Tubing Bundle Replacement   
Building 14 - Wycliffe replaced the heat exchanger tubing bundle for several steam generators at the Naval Security Station site.
U.S. Army Corps of Engineers, VA           
SERVICE:  Construction         
Wycliffe is currently renovating a secure SCIF building to upgrade all the HVAC and BAS systems.  This will encompass all new ductwork, vav’s, upgrade of the electrical systems including; UPS’, switchgear and panels.  All work will be done while secure operations are ongoing in adjoining sections.
 
U.S. Department of Homeland Security Citizenship & Immigration Service, Washington, D.C.
SERVICE: Construction Services           
Wycliffe provides services from basic electrical and mechanical to full renovation of suites. We are listed as a preferred vendor for USCIS’s upcoming Data Center project located at 111 Mass Ave N.W. Washington, D.C.  Wycliffe has performed a wide range of projects through several of DHS’ landlords.
 
U.S. Department of Interior, VA          
SERVICE:  Phone Systems                                   
Wycliffe installed new phone systems and low voltage wiring for phone systems at five buildings.
 
U.S. Department of Interior NCTC, WV           
SERVICE:  Construction         
Wycliffe renovated two floors in the Entry Auditorium that had been damaged by a previous sprinkler leak.  The project entailed framing, drywall, painting, sprinklers, fire alarm, and heavy in specialized millwork.
 
U.S. Department of Interior NCTC, WV           
SERVICE:  Plumbing Upgrades
Wycliffe renovated seventeen buildings to upgrade the plumbing systems to adhere to NCTC’s water conservation efforts.  This entailed electrical systems, new automatic state of the art hand dryers, low flow automatic faucets for kitchens and restrooms, low flow automatic flushers for water closets and urinals, new paper towel dispensers.
U.S. Department of Interior NCTC, WV           
SERVICE:  Construction         
Wycliffe is currently renovating one wing of the Instructional West building which will be done in less than three months.  This project is heavy in specialized millwork.
back to top >>
U.S. Department of Labor HQ, Washington, DC   
SERVICE: Studio Renovation   
Wycliffe renovated DOL’s studio at the main headquarters site. We worked with DOL’s media engineer to design and streamline the process with this agency to develop and complete the project based on specific needs of the department. Wycliffe provided all construction, mechanical and electrical for the project. We were then asked to return to install Sound Proof Doors for the film studio as well as additional lighting changes.
 
U.S. Department of Labor, Headquarters, VA   
SERVICE: Interior Alterations                          
Wycliffe renovated one wing on the 2nd floor of the headquarters building at 200 Constitution Ave. N.W.; demolition, framing, drywall and electrical.
 
U.S. Department of Labor, Mine Saftey Health Administration, Multiple Sites           
SERVICE: Phone Systems  
Wycliffe has installed new and/or replaced numerous phone systems and low voltage wiring for phones and data at numerous locations CONUS and OCONUS.
 
U.S. Department of Labor, National Mine Safety & Health Academy, WV
SERVICE: Administrative Support         
Wycliffe provides a Supply Technician at the Beckley, WV Mine Safety & Health Academy location for a contract that began January 23, 2007 for an initial one year period. The contract has been amended since then to incorporate Four Option Years which are exercised one year at a time. The Supply Technician is responsible for organizing and handling inventory of government property which also includes travel to remote locations.
 
U.S. Department of Labor Mine Safety & Health Administration, Arlington, VA       
SERVICE: Interior Alterations          
Wycliffe has completed numerous interior alterations for this agency at their headquarters in Arlington, Virginia.  We have provided all planning, programming, construction, electrical, voice/data and mechanical processes for this agency.
 
U.S. Department of Labor, Mine Safety & Health Administration, VA  
SERVICE: Data Center Maintenance                  
Wycliffe provides Facility Management Services for MSHA’s Arlington, VA Data Center. This is a one year contract that began February 11, 2009 and expires February 12, 2010 with four option years. Wycliffe is currently entering into its first option year for this facility under this agreement. Wycliffe fully understands and responds on an immediate basis for any emergency related issues and coordinates all maintenance required at this facility. Wycliffe had previously been taking care of this site for the three years prior to this new contract award which was bid competitively.
 
U.S. Department of Transportation HQ (Demolition), Washington, DC
SERVICE: Lektrevier Demolition                        
With minimal notice, Wycliffe provided demolition and hauling of twenty-two electric file cabinet systems. These systems were very heavy and cumbersome to disassemble and remove offsite, which caused it hard to find a suitable contractor able to facilitate the work in a very short timeframe. However, Wycliffe organized a team within two days to facilitate this project and in doing so, prevented DOT from incurring a severe penalty from its existing landlord.
back to top >>
U.S. Department of Treasury (FMS), Washington, DC
SERVICE: Interior Renovations              
Wycliffe has completed numerous interior alterations for this agency at their Liberty Center location. We have provided all planning, programming, construction, electrical, voice/data and mechanical processes for this agency. 
 
University of Maryland Medical Systems, MD
SERVICE: Data Center Maintenance Contract
Wycliffe provided maintenance and emergency services for UMMS’s Columbia Gateway Data Center for a period of one year.  This included replacement of equipment that was beyond its life expectancy as well as upgrades to centrifugal chillers and boilers.   
 
University of Maryland Medical Systems, MD
SERVICE: Stairwell Painting                               
Wycliffe painted all interior stairwell walls in two stairwells & all hand railings in the UMMS facility. The building consisted of 12 stories.
 
WV Air National Guard, WV
SERVICE: Mechanical, Electrical and Interior Finishes
Competitive Bid won by Wycliffe for installation of 5 ton Trane split system, 30 KVA transformer, circuit panel, and associated wiring. Interior finishes include carpet/cove base and acoustic ceiling installation. Project duration was 120 days.
back to top >>
   
   
   
   
Our clients include...
CB Richard Ellis
U.S. Fish & Wildlife Service
National Conservation Training Center
M & T Bank.
U.S. Army Corps of Engineers
U.S. Department of Homeland Security
U.S. Department of Transportation
WV Air National Guard
University of Maryland Medical Center
U.S. Secret Service
Naval Sea Systems Command
Bechtel
Columbus Properties, LP
TK Services
U.S. Department of Labor
General Services Administration
U.S. Department of the Treasury
U.S. Department of the Interior
 
1341 Hughes Ford Road, Suite 101
Frederick, MD 21701
Phone: 240.629.8662
Fax: 240.629.8671
email: info@wycliffeinc.com
 
 
 
 
 
 
 
 
 
 
 
 
 
 
           
 
Home About Capabilities Projects Bid Room Contact